Juice Processor
A processing line funded against installation milestones, so the retail reset did not pass the client by.
A beverage producer with a retail reset already on the calendar
A juice and beverage processor in northern Nevada, producing for its own label and for co-packing customers.
A line that had to be installed and validated before a date it did not control
The company had won placement contingent on being able to supply from a specified reset date. A processing line of this scale is not a purchase so much as a project: long-lead equipment, staged delivery, installation and validation, all of it in sequence. Paying deposits and progress billings out of cash while the line was still months from producing revenue would have drained the working capital the company needed to actually run the launch.
Funding released against milestones rather than in one lump
Alliance Funding Group structured the facility to fund against installation milestones, releasing against progress billings as equipment was delivered and set rather than at a single closing. That matched the money to the project's real sequence and kept the company's own cash available for inventory and labor through commissioning.
Commissioned in time to ship against the reset
The line was installed, validated and producing in time to supply the reset. The company added co-packing capacity it could sell to other brands, turning a single contract requirement into a second revenue line.