A refrigeration plant rebuilt between seasons, because field heat does not wait for a budget cycle.
A Salinas Valley harvester cooling greens within hours of cutting
A crop harvesting company in the Salinas Valley, handling leafy greens and row crops through the region's compressed harvest windows. Its business depends on pulling field heat out of product within hours of the cut.
Aging refrigeration, and a peak the old plant could no longer carry
The cooling plant had reached the end of its practical life. During peak weeks it could not pull temperature fast enough to keep pace with what the crews were cutting, and every hour of delay showed up as shelf life the buyer would not pay for. Replacing condensers and evaporators mid-season was not an option, which left a narrow window between seasons to finance, install and commission the whole system.
One facility across the full refrigeration project
Alliance Funding Group financed the complete condenser and evaporator package on a single schedule, covering the equipment and the installation work rather than the hardware alone. Structuring it as one facility meant the project did not have to be split across vendors or staged across 2 seasons, and the payment schedule was matched to the operation's harvest-driven cash cycle rather than a flat calendar.
Through peak at temperature, with the season never interrupted
The plant was rebuilt and commissioned inside the between-seasons window. The operation went through its next peak pulling temperature at the rate the harvest demanded, protecting both shelf life and the buyer relationships that depend on it.
Get Started